HSG250 Compliance Scorecard

Score your permit-to-work system against the 12 key requirements in HSE guidance document HSG250. Get a detailed gap analysis.

Rate your permit-to-work system against the 12 key requirements from HSE guidance document HSG250. Each requirement maps to a specific section of the guidance.

Planning

Written procedure defines when permits are required

HSG250 §12

Permit types match the hazards on your sites (hot work, confined space, etc.)

HSG250 §14-18

Training programme for permit issuers and authorisers

HSG250 §23

Issue

Permits include hazard-specific checklists (not generic)

HSG250 §19

Dual-signature authorisation (applicant + authoriser)

HSG250 §20

Time-limited validity (single shift maximum)

HSG250 §21

Control

Active permits are visible and tracked

HSG250 §22

Cross-referencing when multiple permits overlap in one area

HSG250 §24

Close-out

Formal close-out with signed handback

HSG250 §25

Permits cannot remain open beyond validity period

HSG250 §26

Audit

Completed permits are stored and retrievable

HSG250 §27

System is reviewed and audited at least annually

HSG250 §28